Hi,
Im currently studying at Mq and last session i did 3 units while this session im enrolled in 4 units however i read usyd only takes into account uni results if you did 48 credit points. I got a shit af atar so is it gg?
follow up
Find the construction time of a car which is on the 10th percentile of this distribution.
I need to draw a probability distribution plot but i dont know what to put in the mean and standard deviation as the results i get dont seem right
Can anyone possibly make a graph
I dunno where i can post this but you guys are good at maths
A car manufacturer takes an average of 17.5 hours to construct a car. This includes time for stamping, welding, painting, assembly and inspections. Construction times vary with a standard deviation of 30 minutes and these times...
yeah i have to pass my finals to pass the course
the quizzes are worth 15% which im failing got a credit in the mid sem which is 15% and im sitting on a credit for lab work which is 15%
so the final which is 55% just need to do well and im g for a credit average for the course?
lol im doing hell bad at uni and sitting on fail/pass
can doing well and stuff in the final exams that have a weighting of 50% push that up to a credit fr fam no troll srs honest answers
thanks